A new office campus, PROSEK POINT, has been constructed in the Prague quarter of Prosek. The campus consists of three office towers with proprietary park, piazzetas among the buildings, stores and cafés. The campus offers fully air-conditioned offices with 3m headroom, the buildings are wheelchair accessible, there are 409 underground parking lots and also above-standard features such as a back-up power source or electrically controlled windows in the buildings. The acoustic comfort of users is ensured by the insulation KI 140 Decibel with ECOSE® Technology, 40 to 60mm width and total area of 2,900 square metres.
Knauf Insulation, Ultracoustic Soft glass mineral wool product (20,000 m2) was used in this project for the insulation of the partition walls of this 140m high tower.
Equipment of the technique area (new construction) with Tektalan SD and LP wood wool (1,600 m2).
Knauf 1000° Pipe Insulation, Duct Wrap and Insulation Board .
The Cleveland Brown's 72,500-capacity stadium counts on over 11.65 miles (17.7 kilometers) of Knauf 1000° Pipe Insulation and 120,000 ft2 (11,148 m2) of Knauf Duct Wrap and Knauf Insulation Board to maintain a new level of comfort in this open-air stadium.
Crown FactoryClad, glass mineral wool product (3,500 m2) was used in this project for a built-up metal system to produce a 35m high control tower (including operations and terminal buildings) and new hangars.